About Us

The company was initially registered with the registrar of company as Power Net Energy (Private) Limited in 2006 & was assigned registration No. 218636. Subsequently the company was registered as a limited liability company & presently known as Power Net Energy (Private) Limited & its registration No. is PV 114617 In Corporation with Power Net Energy (Pvt) Ltd.

Power Net Energy (Private) Limited is committed to continuously improve knowledge, techniques & skill & transfer them to the domestic industry, with a view to establishing a lasting Electrical Installation in Sri Lanka. Whilst achieving this, Power Net Energy (Private) Limited continues to make its contribution to society in improving the quality of life ahead of materials gains. Power Net Energy (Private) Limited is one of the highest ranked Electrical Energy Management Company

LATEST PROJECTS

Fortune Agro Industries (Pvt) Ltd - Crysbro Group

Lokahettiya

Agricon International (Pvt) Ltd


Hendala

Sri Lankan Catering Ltd


Katunayake

Vision Pacakging Exports (Pvt) Ltd - Packwell Group

Rathmalana

ENTES AUTHORIZED DEALER IN SRI LANKA

ENTES is an European Standard Company situated in Istanbul, Turkey. We are Dealing & Distributing Since 2017. We are Import Capacitors, Contactors, Relay, Power Meters, Network Anlayzer and More...

Authorization Certificate
-->

Our Mission

POWER NET ENERGY (PRIVATE) LIMITED is excellence driven & committed to take care & satisfy customer needs beyond their expectation by constantly providng quality products & oragnization affords cahllaenging & continued sense of security to our emplyess & enables us to contribute to society in elevating the quality life.

Our Vision

POWER NET ENERGY (PRIVATE) LIMITED aim to bring greater happiness to our customer by improving their quality life, while enhancing stakeholder value.

Our Belief System

POWER NET ENERGY (PRIVATE) LIMITED is dedicated to provide quality products & services satifying the needs & expectations of each customer with a craetive, self -motivated & dedicated tea united under rewarding & healthy enviorment ensuring continual improvemnt in an enviorment friendly manner.

Our Products

  • All
  • Power Factor Correction
  • Power Quality and Energy
  • Lightning Protection Products

Network Analyzer

Make: ENTES

EM 1200 Energy Meter

Make: Schneider

101 Radius Lightning Rod

Make: Liva Grup

82 Radius Lightning Rod

Make: Liva Grup

58 Radius Lightning Rod

Make: Liva Grup

Services

Automatic Capacitor Bank

Design, Supply & Installation of Capacitor Bank, Repair & Modification of Capacitor Bank

ESE Lightning Protection

Design, Supply & Installation of ESE Lightning Protection Systems and Air Termination System

Surge Protection

Design, Supply, Installation and Repair SPD Surge Protection Systems

Earth Protection

Improving Existing Main Earth Protection Systems

Main And Sub DB

Design, Supply & Installation of Main Distribution Boards and Sub Distribution Board

Protection Relay Installation

Phase Failure Relay, Earth Leakage Relay, Over Under Current Monitoring Relays Installation




F.A.Q

Frequently Asked Questions

  • What is Power Factor?

    Power Factor is the ratio of Working Power or Energy (Killowatts or KW) to Apparent or Total Power (KiloVolt-Amperes or KVA) deleived. It Measure how effectively total delived power is being used. A high Power Factor Signalseffective utilization or electrical Power, While a Low Power Factor Indicates poor utilization of electrical Power. However, this is not to be confused with energy efficency or conservation whichapplies only to energy or KW. Improving the Efficiency of Electical equipment reduces energy consumption but does not improved= the Power Factor.

    • Increase line Losses
    • Wasted generator Capacitor (KVA)
    • Wasted distribution / transformer capacity (KVA)
    • Wasted System Capacity (KVA)
    • Reduce System Effiency (KW)
    • Increased maximum demand & related chargers
    • Possible Power Factor Chargers
    • Increase maintenance of Equipment & Machinery
    • Wasted Energy
    • Wasted Investment & operation capitals
    • Additional load requires amd increase in supply size
    • Additional load requires larger disconnecting means
    • Additional load requires higher rated protecting device
    • Cable bus bar ampocity must be rated higher than necessary
    • Unnecessary capital expanditure for such wasted KVA capacity
    • More space required for additional equipment
    • Increase Maintenance and downtime
    • Reduce lifetime of Equipment
    • Causes computers to stop execution of programs
    • Create False data in Computers
    • Erase data in computer memory
    • Result in hardware damage
    • Cause damage to insulation in transformer and motor
    • Cause nuisance tripping of Adjustable - Speed drives
    • Wasted Energy (KW, KVA, KWH)


Contact Us


Address

No. 217/60,Rose Garden, Batuwatta,
Ragama, Sri Lanka, 11010
Your message has been sent. Thank you!